Many agreements name several possible dates and say the earlier or later of them controls. Enter each date with a short label and pick the rule to see exactly which one wins, including whether more than one date ties for control.

Need to apply a sequence of rules instead of comparing fixed dates? See Date Rule Chain Planner.

Worked example

A contract deadline of January 20 and a regulatory deadline of January 25, under an earlier-of rule, are controlled by January 20, the contract date, since it is the smaller of the two dates. Switch to a later-of rule with the same two dates and January 25 controls instead, the regulatory date. When two labeled dates land on the exact same calendar day, the result states plainly that they are tied, listing both labels together, rather than arbitrarily picking one as if the other did not also apply.

Common mistakes

  • Assuming earlier-of and later-of are interchangeable labels for the same thing. They produce opposite controlling dates whenever the input dates actually differ.
  • Entering only one date. At least two labeled dates are required for a comparison to mean anything.

Limitations

This compares the dates exactly as entered. It makes no legal interpretation of which rule a specific agreement actually uses, and it does not resolve ambiguity in the underlying document itself.

Frequently asked questions

How many dates can I compare at once?
Add as many labeled dates as the situation requires, since the underlying rule simply scans every entered date for the controlling one.
What happens with a genuine three-way tie?
All three labels are listed together as tied, with the shared controlling date shown once.